Create a garage surface that is easier to clean and better suited to the way the space is used, after the concrete and moisture conditions are understood.
Assess the existing conditions
Assess cracks, contamination, previous coatings and moisture transmission. The applicator should distinguish dormant surface defects from movement or water problems that a coating cannot resolve.
Choose the complete system
Compare the selected system's preparation, texture and resistance with wet footwear, vehicle traffic and workshop use. A glossy sample may not suit a frequently wet route; agree the balance of appearance, grip and cleanability.
Plan the connected work
Plan clearance of stored items, ventilation and curing around actual garage access. Include edges, thresholds and repair boundaries, with explicit return-to-vehicle-use instructions from the chosen system.
What shapes the scope?
- Concrete condition, contamination and moisture findings
- Preparation method and crack-treatment scope
- Coating system, texture and edge detailing
- Storage clearance, environmental control and curing time
What should be checked?
- Prepared substrate and repair boundaries are documented
- Finished texture matches the agreed use and sample
- Vehicle-return and cleaning instructions are supplied
Questions worth asking
Will coating stop water coming through the slab?
Do not assume it will. Moisture conditions must be assessed against the chosen system and underlying causes addressed.
Can the garage be used the following day?
Return-to-use depends on product, conditions and loading. Agree the actual curing schedule before accepting a work date.
Bring the details together.
Add this service to My project. Tell HAUSE what you have, what you want to achieve and where the work is needed. A clearer brief makes it easier to discuss the right assessment, responsible trades and written scope.
Build my project brief ↗

