Five ways to care for home ↗Part of HAUSE ↗
upgrading.caMy project 0
Storage & built-ins / Your next upgrade

Under-stair storage.

Make awkward space useful while retaining access to services and structure.

Oak mudroom storage with fitted cubbies, a bench and a pull-out boot drawer
Illustrative home concept

Make an awkward existing space useful while respecting the stair structure and the services that may pass through it.

Assess the existing conditions

Survey the stair geometry, wall construction and any access panels before planning drawers or cupboards. The provider should identify structural or fire-related questions that need specialist review.

Choose the complete system

Compare deep pull-outs with smaller accessible bays according to the objects being stored. A large drawer can become heavy and difficult to retrieve; account for its full travel into the adjoining room.

Plan the connected work

Define which finishes can be altered and which supports remain untouched. Coordinate lighting, service access and ventilation, with a measured layout and an agreed fixing arrangement before manufacture.

A more useful quotation

What shapes the scope?

  • Stair geometry and usable internal volume
  • Structural or service assessment requirements
  • Drawer loading, travel and mechanism selection
  • Door fronts, trim and adjacent finishing
Agree the finish line

What should be checked?

  • Stair and service requirements remain respected
  • Open storage elements do not block essential circulation
  • Mechanism limits and access arrangements are documented

Questions worth asking

Can stair supports be removed for more space?

Do not assume so. Any structural change requires assessment and an appropriate design before storage is planned around it.

Are deep drawers the best option?

They suit some objects, but compare their loaded weight and opening route with accessible shelves or smaller compartments.

Bring the details together.

Add this service to My project. Tell HAUSE what you have, what you want to achieve and where the work is needed. A clearer brief makes it easier to discuss the right assessment, responsible trades and written scope.

Build my project brief ↗

Consider it together.

Connected stages, distinct jobs

What comes before or after?

Coordinate the dependencies when they apply to your home. These services have a separate purpose and scope.

Your home. Your next chapter.

Let’s make it work better.

One small improvement or a bigger plan. Tell us what you have in mind.

Start your upgrade